Decide what to automate
Use this skill when someone asks whether a process is worth automating, or has a list of candidates and must choose: "should we automate this", "is this worth building", "what should we automate first", "prioritize the automation backlog", "what's the ROI of automating this", "build it or keep doing it by hand". Produces a scorecard per candidate (volume, hands-on minutes, exception rate, error cost, process stability, build and run cost), a payback period with its assumptions, and a verdict: automate now, automate a slice, fix the process first, or do not automate.
By- name:
- decide-what-to-automate
- description:
- Use this skill when someone asks whether a process is worth automating, or has a list of candidates and must choose: "should we automate this", "is this worth building", "what should we automate first", "prioritize the automation backlog", "what's the ROI of automating this", "build it or keep doing it by hand". Produces a scorecard per candidate (volume, hands-on minutes, exception rate, error cost, process stability, build and run cost), a payback period with its assumptions, and a verdict: automate now, automate a slice, fix the process first, or do not automate.
Applies before anything is specced or built. Produces a verdict per candidate that the process owner and whoever pays for the build would both sign.
The play
- Count from the record, not the story. Pull the last 30 instances, or the last 4 weeks, from the system where the work lands: tickets, invoices, rows, sent emails. "We do this all the time" often turns out to be 14 a month. If there is no record, have the people doing it log every instance for two weeks before you score it.
- Time the hands-on minutes. Watch two or three real runs, or ask for start and stop times. Count the minutes a person works, not the elapsed time while the work waits in a queue. Waiting is a speed problem and gets valued separately, if at all.
- Count the exceptions. Of those 30, how many left the standard path: missing data, a judgment call, a back-and-forth, a special customer? Exceptions still reach a person after you automate, so they come off the saving.
- Price one wrong outcome. What does a single error cost, who notices, and how late? A wrong internal tag costs a minute. A wrong payment, a wrong customer email or a missed access revocation can cost more than a year of savings, and it forces an approval gate whose review time you must count.
- Check stability. How many times did the steps, rules or underlying systems change in the last 12 months, and is a migration, reorg or policy rewrite planned in the next 6? An automation of a moving process gets rebuilt before it pays back.
- Price the build and the run. Builder hours times a loaded rate, times 1.5 for the first build against a system you have not integrated before. Then monthly cost: run fees, about 1 hour of maintenance per connected system, 2 to 4 more hours for any AI step, and the reviewer time of every approval gate.
- Compute payback. Monthly net saving = runs per month x hands-on minutes x (1 - exception rate) / 60 x loaded hourly rate, minus the monthly cost. Payback in months = build cost / monthly net saving. Formulas, rates and three worked cases are in
references/scoring.md. - Apply the thresholds.
- Under 6 months: automate now.
- 6 to 12 months: automate only if it also removes a risk you can price or a bottleneck someone is waiting on.
- Over 12 months: do not build it as scoped. Most automations need a significant rework within 12 to 18 months as the systems around them change, so a longer payback rarely arrives.
- Exception rate over 30%: automate the slice (gather the data, draft, route) and leave the decision with a person. Over 50%: standardize the process first.
- Run the do-not-automate list below, even when the payback looks good.
- Write the verdict with the assumptions that drove it and a check 30 days after go-live that compares real volume, exceptions and minutes with the estimate.
For a backlog of more than five candidates, shortlist with the quick triage score in references/scoring.md and do the full payback only on the top ones.
Do not automate
- Work that runs fewer than 2 times a month with a low error cost. A checklist is cheaper.
- A process no two people do the same way. You would be encoding one person's habits.
- A step that is itself the control: the second pair of eyes on payments, access grants or contract terms. Automate the preparation, not the check.
- A decision someone must own by name: a dismissal, a credit limit, a pricing exception. Automate the evidence pack.
- A process due to change within 6 months.
- A one-time cleanup or migration. Run a reviewed script once, with approval, and leave no standing automation behind.
- Anything with no owner willing to receive its failure alerts.
What good looks like
- The tell: the best lead asks "how many last month, and how many of those were weird?" before anyone mentions a tool. The answer usually halves the estimate.
- The common mistake: savings computed as volume times minutes, with no exceptions, no maintenance and no review time. That number is often close to twice the real one.
- The quiet miss: ranking by excitement. The best first candidates are boring hand-offs between two teams, with high volume and clean inputs.
- Good output: every number has a source (a count, a timed run, a named estimate), the verdict follows from the thresholds, and a stranger could redo the math and get the same answer.
Rules
- MUST count volume and exceptions from real records, or mark the score provisional.
- MUST subtract exceptions, maintenance and approval-review time from the saving.
- MUST put a price on the cost of one error, even a rough one, and say who would notice it.
- NEVER recommend automating a control step or a decision that needs a named owner.
- NEVER present a saving without its assumptions and the 30-day check.
Open this reference as its own page
Use the triage score to cut a long list down. Use the payback math to decide. Never ship a verdict from the triage score alone.
Quick triage score
Score each factor 0, 1 or 2 from what you can learn in a 15-minute conversation plus a look at the record.
| Factor | 0 | 1 | 2 |
|---|---|---|---|
| Volume | Under 10 runs a month | 10 to 100 | Over 100 |
| Hands-on minutes per run | Under 3 | 3 to 15 | Over 15 |
| Exception rate | Over 30% | 10% to 30% | Under 10% |
| Error exposure | A wrong run is costly and irreversible, or invisible for weeks | Costly but reversible, or caught by an existing check | Cheap and visible within a day |
| Stability | 3 or more changes in 12 months, or a change planned in the next 6 | 1 or 2 changes | No changes |
| Input quality | Free text, scans, scattered across places | Mixed | Structured fields from one system |
| Build effort | New integrations, unclear access, over 3 weeks | 1 to 3 weeks | Days, systems already connected |
Total out of 14:
- 10 or more: do the full payback now.
- 7 to 9: measure properly (count, time, exceptions) before deciding.
- 6 or less: park it with the reason written down.
- Any 0 on error exposure or stability: read the do-not-automate list before anything else.
Getting the numbers
- Volume. Count from the system of record over 4 weeks, then check the previous 3 months for peaks. Use the 3-month average for savings and the peak month for capacity. Month-end and quarter-end often carry 2 to 3 times the normal load.
- Minutes. Time at least 3 real runs. Self-reported minutes are often off by a third in either direction: people remember the clean runs and forget the lookups.
- Exceptions. Ask "show me the last one that went wrong" and "which customers or suppliers are always different". Then count them in the sample of 30.
- Loaded hourly rate. Annual salary x 1.3 / 1,700. Benefits, taxes and overhead add roughly 25% to 40% on top of salary, and a year holds about 1,700 productive hours after holidays, leave and meetings. A 52,000 salary gives a rate of about 40 an hour.
- Build cost. The builder's estimate, times 1.5 for every system not integrated before (access, authentication and data quirks eat the time), plus testing equal to a third of the build.
- Monthly cost. Run fees, plus maintenance at about 1 hour per connected system per month, plus 2 to 4 hours per AI step (reviewing samples, adjusting to input drift), plus the time reviewers spend at approval gates and spot checks.
Payback math
gross monthly saving = runs per month x minutes per run x (1 - exception rate) / 60 x loaded rate
monthly net saving = gross monthly saving - run fees - maintenance - review time
payback in months = build cost / monthly net saving
If the net saving is zero or negative, the time case is dead. Only a priced risk can carry it, and the verdict must say so.
Worked case 1: supplier invoice coding (automate now)
- Volume: 640 invoices a month, counted from 4 weeks of the payables record.
- Minutes: 4.5, from three timed runs of 3.8, 4.6 and 5.1 minutes.
- Exceptions: 7 of 30 sampled (23%): missing purchase order, amount mismatch.
- Error cost: a wrong expense code is caught at month-end close and takes about 20 minutes to fix. Reversible and visible.
- Stability: no changes in 12 months, none planned.
- Rates: clerk 40 an hour, builder 85 an hour.
- Build: 36 hours, both systems already connected: 3,060.
- Monthly cost: run fees 40, maintenance (2 systems at 1 hour, 1 AI step at 3 hours) 425, a 5% spot check of 32 invoices at 1 minute each 21. Total 486.
- Gross saving: 640 x 4.5 x 0.77 / 60 = 37 hours x 40 = 1,478.
- Net saving: 1,478 - 486 = 992 a month. Payback: 3,060 / 992 = 3.1 months.
The naive estimate (640 x 4.5 / 60 x 40 = 1,920 a month) was almost twice the real saving. The verdict holds either way, but the 30-day check is measured against 992, not 1,920.
Worked case 2: leaver access removal (automate a slice, on risk)
- 5 leavers a month, 50 hands-on minutes each across 6 systems, 10% exceptions. IT rate 55.
- Gross saving: 5 x 50 x 0.9 / 60 = 3.75 hours x 55 = 206.
- Full build: 35 hours x 1.5 (4 systems not yet connected) = 52.5 hours x 85 = 4,463.
- Monthly cost: maintenance 6 hours x 85 = 510, run fees 20. Net saving: 206 - 530 = minus 324. It never pays back on time.
- The real driver is risk: the last access review found 3 of 41 leavers with an active account weeks after their last day.
- Verdict: automate a slice. A daily reconciliation compares the leaver list with the identity directory and the two systems holding customer data, and opens a task per open account. Removal stays a human action. Build 12 hours (1,020), maintenance 3 hours a month (255). The security owner signs that one orphaned account with customer-data access is worth far more than about 4,000 a year. The verdict states that it is a risk decision, not a time saving.
Worked case 3: sales proposals (automate a slice, on time)
- 45 proposals a month, 70 minutes each, 60% exceptions (custom terms, legal review). Full automation fails the exception threshold.
- The slice: assemble the account data, the pricing table and the approved standard sections into a draft. That saves about 25 of the 70 minutes on every proposal, exceptions included, because the preparation is the same for all of them.
- Gross saving: 45 x 25 / 60 = 18.75 hours x 70 = 1,313.
- Build 30 hours x 85 = 2,550. Monthly cost: maintenance 2 systems plus 1 AI step = 5 hours x 85 = 425, run fees 30. Net: 858.
- Payback: 2,550 / 858 = 3.0 months. Verdict: automate the slice now. The proposal and its terms stay with the account owner.
Speed and quality value
Count speed only when you can name the metric that moves and the person who will measure it, for example "first response to an inbound lead drops from 3 hours to 5 minutes, measured weekly by the sales lead". If someone attributes revenue to it, use their number at half value until 60 days of real data confirm it. Count error reduction only when you have the current error rate from the record, not from memory.
The 30-day check
Recompute with real numbers 30 days after go-live. If volume, exceptions or minutes are more than 25% off the estimate, rewrite the scorecard. If the payback now exceeds 12 months, raise it with the owner: shrink the scope, simplify, or turn it off. An automation that does not pay for itself still costs its maintenance every month.
More in this playbook
Agent or workflow
Use this skill when designing or reviewing an automation that has, or might need, AI in it: "should this be an agent", "can AI handle this step", "add an LLM to the workflow", "build an AI agent for this process", "where does AI fit", "the agent keeps doing the wrong thing". Decides per step whether it should be deterministic workflow logic, a single bounded AI step, or an agent, and produces a step table with the reason for each choice plus the guardrails every AI step needs: structured output, post-checks, confidence routing, fallbacks and human gates.
DesignHuman approval gates
Use this skill when designing, reviewing or fixing the points where an automation waits for a person to say yes: "add an approval step", "who should approve this", "human in the loop", "approvals are piling up", "people just click approve", "what if nobody approves", "audit the approvals". Produces a spec per gate: when it triggers, who approves, exactly what the approver sees, the timeout and escalation ladder, batching rules that resist rubber-stamping, the audit record, and when the gate may be relaxed.
DesignSpec the automation
Use this skill when someone wants to automate a business process before it is built: "when X happens, do Y", "automate this", "design the workflow", "build me a flow", "turn this manual process into an automation". Produces a build-ready spec that any tool or person can implement without asking a question: trigger, dedupe key, steps with inputs and side effects, approval gates, failure paths, test data and open questions.
