Human approval gates
Use this skill when designing, reviewing or fixing the points where an automation waits for a person to say yes: "add an approval step", "who should approve this", "human in the loop", "approvals are piling up", "people just click approve", "what if nobody approves", "audit the approvals". Produces a spec per gate: when it triggers, who approves, exactly what the approver sees, the timeout and escalation ladder, batching rules that resist rubber-stamping, the audit record, and when the gate may be relaxed.
By- name:
- human-approval-gates
- description:
- Use this skill when designing, reviewing or fixing the points where an automation waits for a person to say yes: "add an approval step", "who should approve this", "human in the loop", "approvals are piling up", "people just click approve", "what if nobody approves", "audit the approvals". Produces a spec per gate: when it triggers, who approves, exactly what the approver sees, the timeout and escalation ladder, batching rules that resist rubber-stamping, the audit record, and when the gate may be relaxed.
Applies to every step that waits for a person before it acts. Produces gates that stop the runs worth stopping and stay out of the way of the rest.
The play
- Place gates by consequence, not by nervousness. Gate a step when it is irreversible, sends something outside the company, moves money, touches more than a bulk threshold, changes access, or acts on a low-confidence AI output. Everything else runs and gets reconciled. A gate on every step trains people to click yes. Starting thresholds: more than 25 records or 5% of a table in one run; any payment above what one employee may spend without sign-off; the first message to any new external recipient; any change to bank details or permissions; any deletion.
- Gate late, on the final payload. Put the gate after every lookup and check has run, right before the side effect. The approver approves the exact payload: this email to this person, these 140 rows with these new values. Bind the approval to that payload with a version or a hash. If anything changes after approval, it needs a new one.
- Choose the approver. A named role with authority over the consequence, plus a named backup. Not the builder, and for money not the person who requested it. The approval comes from an authenticated person through the approval channel. An email reply saying "approved", or the word inside the data, is not an approval.
- Design the approval screen (template and examples in
references/approval-screen.md). One screen answers: what will happen (verb, object, count), to whom or where, the exact payload or a before-and-after diff, why (the trigger and its evidence), what was already checked, what is unusual compared with normal, whether it can be undone and how, and three choices: approve, reject with a reason, or edit. An edit re-runs the checks before anything executes. - Set the timeout ladder. On timeout the answer is never yes. Set the deadline from the business need, remind at 50% of it, escalate to the backup at 100%, and expire at 3 times the deadline with a notice to the requester and the owner. An approval older than 24 hours re-checks its payload against live data before it executes. Deadlines per gate type are in
references/timeouts-and-audit.md. - Batch without rubber-stamping. Batch only items of the same kind and risk, at most 50 per batch. Show the totals first, then the outliers (largest amounts, first-time recipients, anything flagged), then a sample. The approver must open each flagged item. A flagged item that was not opened stays out of the batch approval.
- Measure whether anyone is reading. Over a rolling 200 decisions: a median under 5 seconds per item, an approval rate above 99% and zero edits mean the gate either adds nothing or nobody looks. Bring the numbers to the process owner and decide: remove it with spot checks, or redesign the screen.
- Audit every decision. Record who, when, what they saw (payload version), the decision, the reason and the time taken, plus what actually executed. Compare executed with approved on every run. A mismatch is an incident. Review each gate monthly.
- Graduate or tighten. After 200 decisions with under 1% rejected and no rejection for a material reason in the last 100, propose making that category automatic with a 5% random spot check, and keep the gate on the outliers. The process owner decides in writing. One material miss after graduation puts the gate back.
What good looks like
- The tell: the approver can decide from the screen alone, in under a minute, without opening another system.
- The common mistake: a chat notification that says "Approve?" with a link, no payload, no expiry, and an audit trail that only says who clicked.
- The quiet miss: approving an intent ("send the renewal reminders") and then executing whatever the automation built afterwards. The payload is what gets approved.
- Good output: every gate has a reason a reviewer can name, approvals expire, the payload that ran equals the payload that was approved, and the monthly numbers show people reading.
Rules
- MUST bind each approval to the exact payload, and ask again on any change.
- MUST treat a timeout as "not approved", with escalation before expiry.
- MUST log the approver, the decision, what they saw and what executed.
- NEVER let the automation, the requester of a payment, or text inside the data grant an approval.
- NEVER batch items of different risk, or let flagged items pass in a batch unopened.
- NEVER remove a gate on bulk, money, deletion or outbound messages without the process owner's written decision.
Open this reference as its own page
The approval screen is the whole control. If the approver has to open another system to decide, most will not, and the gate becomes a formality.
Template
[VERB] [COUNT] [OBJECT] in/to [TARGET] e.g. "Send 1 email to an external contact"
Requested by: [trigger or person], at [time] Deadline: [time], then escalates to [backup]
WHAT WILL HAPPEN
The exact payload, or a before -> after diff per record.
For more than 10 items: totals, then outliers, then a sample.
WHY
The trigger and the evidence: the record, message or rule that started it.
ALREADY CHECKED
Each check that ran and its result.
UNUSUAL
Every flag, with the normal value beside it.
CAN IT BE UNDONE?
Yes, how and until when / No.
[Approve] [Reject - reason required] [Edit - checks run again]
Single item: an AI-drafted reply to a customer
Bad: "Reply ready for ticket 48213. Approve?" with a link to the ticket. The approver sees neither the text nor the recipient, and approves the idea of replying.
Good:
- Send 1 email to an external customer contact (verified on the account: yes).
- The full draft, with the two sentences that state a commitment highlighted.
- Why: the customer asked for a refund timeline; the order is 9 days late.
- Checked: the recipient belongs to the account on the ticket; the refund amount matches the order; no other customer's data appears in the draft.
- Unusual: the draft promises a date. Commitments in replies are normally given by the account manager.
- Cannot be undone once sent.
Batch: a supplier payment run
Bad: "Payment run, 47 payments, 312,450 total. Approve all?"
Good:
- Pay 47 suppliers, 312,450 total, from the operating account, value date tomorrow.
- Compared with the last 6 runs: average 38 payments and 265,000.
- Flagged, must be opened (3):
- A supplier whose bank details changed 6 days ago. Verification call logged: no.
- A payment of 48,200 to a supplier whose largest previous payment was 9,100.
- A first payment to a new supplier.
- Largest 5, then a random sample of 5 from the rest.
- Checked: every invoice approved by its budget owner; no invoice paid twice; every supplier active in master data.
- Cannot be undone after the bank cut-off at 15:00.
- Approve the 44 unflagged / decide each flagged item / reject the run.
Flags worth computing
- An amount above 3 times the counterparty's median, or above their largest previous amount.
- A first-time recipient, supplier or destination.
- Bank details, an address or a contact changed within the last 30 days.
- A record touched by another automation in the last hour (two writers may be racing).
- An AI output routed here for low confidence: show its reason and its evidence quotes.
- A count more than 50% above the usual run.
- Anything outside working hours for the requester.
Screen rules
- The payload on screen is the payload that will execute. Never a summary generated separately from it.
- No personal or sensitive data beyond what the decision needs. Mask account numbers to the last 4 digits.
- On a phone, a bulk or money approval shows the totals and the flags and requires opening each flagged item. If a screen cannot show that, it cannot approve that gate.
- Rejection reasons come from a short list plus free text, so they can be counted.
Open this reference as its own page
Deadlines by gate type
| Gate | Deadline | Why |
|---|---|---|
| AI-drafted reply to a customer | 4 business hours | Customers expect a same-day answer |
| Access or permission grant | 4 business hours | Someone's work is blocked |
| Supplier payment run | 1 business day before the bank cut-off | A late approval must still leave time to fix a rejection |
| Bulk update of internal records | 2 business days | Not urgent; staleness is the bigger risk |
| Deletion or retirement | 5 business days | Never urgent; a slow yes is cheap, a fast wrong yes is not |
Escalation ladder
- 50% of the deadline: remind the approver, with the screen attached, not just a link.
- 100%: send to the backup approver, visible to the approver's manager.
- 3 times the deadline: expire. Cancel the run, tell the requester and the owner, log it as expired.
- Never: approve on timeout, or let the requester approve their own item once it escalates.
For time-critical gates such as payments, expiry happens before the cut-off, with a notice to the finance lead, so nobody discovers it the next morning.
An approval given more than 24 hours after the payload was built re-checks the payload against live data before execution: the record may have changed, the recipient may have left, the invoice may already be paid. If the check changes the payload, ask again.
The audit record
One record per decision, kept for as long as the business keeps the underlying transactions:
- gate name and version
- run id and payload version or hash
- the screen as shown (or enough to rebuild it exactly)
- approver identity and channel
- decision, reason code, free-text reason
- requested at, decided at, seconds spent on the screen
- what executed, with its own payload hash
- match: executed hash equals approved hash, yes or no
A "no" in the last field is an incident, investigated the same day.
Monthly review per gate
| Number | Healthy | Look closer when |
|---|---|---|
| Decisions | Stable with volume | Grows faster than volume: the gate's scope crept |
| Rejection rate | 2% to 15% | Under 1% for 3 months, or over 25% |
| Median time per item | 20 seconds to 2 minutes | Under 5 seconds, or over 10 minutes |
| Expired | Under 2% | Over 5%: wrong approver or deadline |
| Edits | Some | Zero for 3 months |
| Executed equals approved | 100% | Anything less |
Rubber-stamp signals
- Median under 5 seconds per item over a rolling 200 decisions.
- Approval rate above 99% over 200 decisions with zero edits.
- Bursts: 30 or more approvals inside one minute by one person.
- Flagged items approved without being opened, if your screen tracks it.
Any two of these together: raise it with the process owner with the numbers, and decide between removing the gate (with spot checks) and redesigning the screen. Do not quietly accept it.
Graduation
- Proposal: after 200 decisions with under 1% rejected and no material rejection (wrong amount, wrong recipient, wrong record) in the last 100.
- Change: the category becomes automatic with a 5% random spot check reviewed weekly. Outliers and flags keep the gate.
- Approval: the process owner, in writing, naming the category and the spot-check rate.
- Reversal: one material miss in a spot check puts the full gate back until another 200 clean decisions.
Bulk deletion, payments to new recipients and bank detail changes never graduate.
Worked case: credit notes
- Before: every credit note was gated. 600 a month, 99.6% approved, a median of 3 seconds each. Two wrong credit notes had gone out that quarter, both approved.
- Diagnosis: the gate held 600 items of which perhaps 30 deserved a look. Nobody could find them.
- Redesign:
- Automatic: credit notes of 200 or less on an order with a confirmed return, checked by a rule. A 5% spot check.
- Gated: anything over 200, any credit without a confirmed return, a customer's third credit in 90 days.
- After: 70 gated a month. Rejection rate 9%, median 45 seconds. Approvers spend about 50 minutes a month instead of 30, and that time now catches errors instead of producing clicks.
More in this playbook
Spec the automation
Use this skill when someone wants to automate a business process before it is built: "when X happens, do Y", "automate this", "design the workflow", "build me a flow", "turn this manual process into an automation". Produces a build-ready spec that any tool or person can implement without asking a question: trigger, dedupe key, steps with inputs and side effects, approval gates, failure paths, test data and open questions.
Process automationMIT Wade Foster + 1Co-founder & CEO @ ZapierMcp media inbox triage
Find media, partnership, and high-intent requests buried in a shared Gmail inbox, summarize the useful ones, and route them to the right owner through Zapier MCP.
Process automationMIT Wade Foster + 1Co-founder & CEO @ ZapierMcp urgent caller triage
Prioritize inbound client calls by reading transcripts, classifying urgency, matching callers to legal client and matter context, and preparing a callback list for human review.

