Now inviting automation leaders: publish your playbook as a skill, under your own name. Publish yours →
Automation Skills
All skills/Agent production operations/Runtime-control-plan
Reference · Agent production operations

Runtime-control-plan

Part of Agent production operations. Install the skill and your agent reads this page when it needs the depth.

Runtime Control Plan

Defines the versioning, rollout, and fallback strategy for an agent operating under the agent-production-contract.md.

1. Versioning

All five dimensions of an agent are independently versioned and recorded in the production contract.

1.1 Model versioning

Field Description
model_id Unique model identifier (provider + model name + version hash)
model_version Provider-assigned version or deployment timestamp
model_fallback Fallback model to use if the primary model is unavailable
model_capability_baseline Reference eval scores against the current eval suite
model_regression_threshold Maximum acceptable score drop before the model version is blocked (e.g., "no more than 5% drop on any eval case")

Change procedure: a new model version must pass the full eval suite before it can be referenced in a production contract. Model regression in production (observed via trace-to-eval feedback) triggers an automatic eval re-run. If regression exceeds the threshold, the runtime falls back to the previous model version.

1.2 Prompt versioning

Field Description
prompt_id Unique prompt identifier (hash of prompt template + system message)
prompt_version Monotonically increasing version number
prompt_change_summary Human-readable description of the change
prompt_eval_baseline Reference eval scores for this prompt version

Change procedure: prompt changes must be evaluated against the eval suite. A prompt-only change that does not alter the tool surface or authority may use a reduced eval subset. Prompt regression triggers fallback to the previous prompt version (not model fallback, unless both regress).

1.3 Tool versioning

Field Description
tool_id Unique tool identifier
tool_version Semantic version of the tool implementation
tool_api_version API version the tool exposes to the agent
tool_health_check Endpoint or command that verifies the tool is operational
tool_deprecation_date Date after which the tool version is unsupported

Change procedure: a new tool or tool version must be registered in the production contract with its health check and authority scope. Tools that change their side-effect surface (new mutation capability) require a production-readiness re-review. Tool version rollback is immediate if the new version fails its health check.

1.4 Policy versioning

Field Description
policy_id Unique policy identifier
policy_version Monotonically increasing version number
policy_rules The set of rules governing agent behavior (authority, escalation, cost, privacy)
policy_change_log Ordered list of policy changes with dates and rationales

Change procedure: policy changes that expand authority MUST be gated by a production-readiness review. Policy changes that restrict authority (tightening thresholds, adding constraints) may be applied immediately but must be recorded in the tool-authority-health record.

1.5 Evaluator versioning

Field Description
evaluator_id Unique evaluator identifier
evaluator_version Semantic version of the evaluator
evaluator_suite The set of eval cases this evaluator runs
evaluator_gate Whether this evaluator is a release gate (blocking or advisory)

Change procedure: evaluator changes that add or modify eval cases must be reviewed for case quality. A blocking evaluator must pass before any corresponding agent version can be promoted to production. Evaluator regression (an evaluator that incorrectly passes or fails) is treated as a production incident and routed through incident-learning.

2. Staged rollout

Rollout proceeds through four stages. Authority expands at each stage only when the stage's exit criteria are satisfied and accountable humans independently grant the scoped authority through AI governance. Passing a rollout stage never grants permissions. Numeric values below are illustrative planning defaults requiring local evidence and governance approval, not universal safety thresholds. Appropriate escalation is a safe outcome, not inherently a regression.

Classify escalation before using rollout metrics

Record trigger, underlying failure (if any), required protective response, acknowledgement, disposition owner, and pending-work deadline separately. A justified protective escalation is correct boundary handling; do not count it as an avoidable failure merely because a human was involved. A tool outage or unauthorized-action attempt remains a failure even when escalation handles it correctly. Missed escalation, needless escalation against the contract, and silent proceeding across a boundary are failures, not low-escalation successes. Use all eligible requests as the denominator for the operational-failure rate; count affected requests once and report protective escalation and unresolved handoff counts separately. Define classification and limits before the canary.

For example, 8 of 100 canary requests correctly escalated for required approval with acknowledged owners and no underlying defect do not fail a zero-failure gate. Eight tool failures correctly escalated remain 8% operational failures. Zero escalations from silently proceeding on those same blocked requests fails boundary handling. Protective escalation is preferable to silent proceeding. A surge in justified escalations can still require a traffic hold for operator capacity or missed acknowledgement SLAs; investigate workload and capacity without reclassifying correct protection as an agent defect. Promotion requires resolved or explicitly accepted residual risks and an owned path for pending work.

Stage 1 — Shadow / dry-run (0% traffic, read-only)

Parameter Value
Traffic 0% of production traffic; replay of logged production requests
Authority Read-only; side effects logged but not executed
Duration Minimum 24 hours or until 1,000 requests processed, whichever is longer
Monitoring Model latency, prompt compliance, uncertainty distribution
Exit criteria p95 latency within 2x baseline; no authority breach attempts; uncertainty distribution within expected range

Stage 2 — Canary (1–5% traffic, read-only with logged side effects)

Parameter Value
Traffic 1% of production, ramping to 5% over the observation window
Authority Read-only in production; side effects logged but not executed (dual-write comparison against existing system output)
Duration Minimum 48 hours
Monitoring All stage-1 metrics plus: cost-per-request, dual-write divergence rate, user-satisfaction-equivalent signal
Exit criteria Cost-per-request within budget; dual-write divergence < 2%; no missed required escalations; avoidable operational-failure rate within the locally agreed limit

Stage 3 — Limited production (5–25% traffic, side-effect-gated)

Parameter Value
Traffic 5% ramping to 25% in 5% increments each 24 hours
Authority Side-effect-capable per the authority contract, with side_effect_approval: gate (human approval required per side-effect class until proven safe)
Duration Minimum 72 hours; each increment gates on the previous increment's exit criteria
Monitoring All stage-2 metrics plus: side-effect audit trail, authority breach counter, classified escalation outcomes, tool health
Exit criteria Side-effect audit clean (no unexpected mutations); authority breach count = 0; avoidable operational-failure rate < 1%; required escalation/handoff evidence complete; all tools healthy (health-check pass rate > 99%)

Stage 4 — Full production (25–100% traffic)

Parameter Value
Traffic 25% to 100% in 25% increments each 24 hours
Authority Only the currently effective authority contract; changing side_effect_approval from gate to auto requires an independently attributable human governance decision and verified external enforcement. Seven clean days alone never authorizes expansion
Duration Continuous monitoring
Monitoring All stage-3 metrics plus: cost-budget tracking, trace-to-eval feedback sampling, production-readiness re-review trigger
Exit criteria N/A — continuous operation; triggers for fallback or disablement remain active

Rollout abort triggers (any stage)

If any of the following occurs during rollout, abort the current stage and fall back to the previous stage's authority level:

3. Fallback

Fallback is a predetermined safe behavior when the agent, model, or a tool cannot operate at normal capability. Fallback is distinct from disablement: fallback preserves reduced capability; disablement removes all capability.

Fallback paths by trigger

Trigger Fallback action Rollback to
Model endpoint 5xx > 30s Switch to model_fallback from the production contract Previous model version
Model regression detected (eval score drop > threshold) Switch to model_fallback; trigger eval re-run Previous model version
Prompt regression detected Revert to previous prompt_version Previous prompt version
Critical tool unhealthy > 2 min Degrade authority: revoke that tool's actions; agent continues with remaining tools Previous tool-set configuration
Cost budget 100% consumed Stop funded dispatch; use cached/no-cost response or separately authorized bounded fallback; retain pending obligations with an owner No new spend from exhausted budget
Observed cost settlement reaches 110% Disable and investigate accounting/overshoot; this is not an extra allowance Offline
Latency p95 > 5x baseline > 2 min Degrade to read-only; switch to model_fallback if model is the latency source Read-only mode
Authority breach detected Immediate: block the action; escalate; if breach count ≥ 3 in 24h, disable Disabled
Privacy breach (PII access outside scope) Immediate: revoke all data access; escalate; mandatory security review Read-only, no data access

Fallback verification

Every fallback path must be exercised in a non-production environment before the agent enters Stage 2 (canary) of rollout. The fallback exercise record includes:

Fallback exercises are repeated at each production-readiness review cycle.

4. Enforce descendant limits in the runtime

For delegated runs, use the attenuation and shared-budget contract in harness coordination. Name the coordinator and execution-boundary policy service that enforce it: intersect each child's grant with the current parent grant, issue scoped credentials, and recheck cancellation, expiry, and revocation before dispatch and commit. Fence stale workers and reconcile effects already in flight.

Use one durable task-budget ledger for parent and all descendants. Atomically reserve bounded cost before concurrent dispatch; settle actual spend and release only unused reservations after reconciliation. Retries and redelegation retain the same ledger identity. Stop new work when available budget is exhausted; read-only fallback and model calls also consume resources and need a funded reservation. Fail closed or use a separately authorized bounded fallback if the authority service or ledger is unavailable. Record enforcement evidence from read-only-parent/write-child, parallel-budget, and cancellation exercises before canary. These instructions and declared limits do not enforce permissions or spend themselves; verify the actual executor and accounting implementation.

<!-- Modified by Automation Skills on 2026-11-24: relative links to files that were not copied now point to the original repository. -->

Publish your skill

Copy this prompt into Claude Code, Codex or any agent. It walks you through your first skill in about 20 minutes, with you as the author.

Click to copy.