# Runtime Control Plan

Defines the versioning, rollout, and fallback strategy for an agent operating
under the [agent-production-contract.md](agent-production-contract.md).

## 1. Versioning

All five dimensions of an agent are independently versioned and recorded in the
production contract.

### 1.1 Model versioning

| Field | Description |
|---|---|
| `model_id` | Unique model identifier (provider + model name + version hash) |
| `model_version` | Provider-assigned version or deployment timestamp |
| `model_fallback` | Fallback model to use if the primary model is unavailable |
| `model_capability_baseline` | Reference eval scores against the current eval suite |
| `model_regression_threshold` | Maximum acceptable score drop before the model version is blocked (e.g., "no more than 5% drop on any eval case") |

**Change procedure**: a new model version must pass the full eval suite before
it can be referenced in a production contract. Model regression in production
(observed via trace-to-eval feedback) triggers an automatic eval re-run. If
regression exceeds the threshold, the runtime falls back to the previous model
version.

### 1.2 Prompt versioning

| Field | Description |
|---|---|
| `prompt_id` | Unique prompt identifier (hash of prompt template + system message) |
| `prompt_version` | Monotonically increasing version number |
| `prompt_change_summary` | Human-readable description of the change |
| `prompt_eval_baseline` | Reference eval scores for this prompt version |

**Change procedure**: prompt changes must be evaluated against the eval suite.
A prompt-only change that does not alter the tool surface or authority may use
a reduced eval subset. Prompt regression triggers fallback to the previous
prompt version (not model fallback, unless both regress).

### 1.3 Tool versioning

| Field | Description |
|---|---|
| `tool_id` | Unique tool identifier |
| `tool_version` | Semantic version of the tool implementation |
| `tool_api_version` | API version the tool exposes to the agent |
| `tool_health_check` | Endpoint or command that verifies the tool is operational |
| `tool_deprecation_date` | Date after which the tool version is unsupported |

**Change procedure**: a new tool or tool version must be registered in the
production contract with its health check and authority scope. Tools that
change their side-effect surface (new mutation capability) require a
production-readiness re-review. Tool version rollback is immediate if the new
version fails its health check.

### 1.4 Policy versioning

| Field | Description |
|---|---|
| `policy_id` | Unique policy identifier |
| `policy_version` | Monotonically increasing version number |
| `policy_rules` | The set of rules governing agent behavior (authority, escalation, cost, privacy) |
| `policy_change_log` | Ordered list of policy changes with dates and rationales |

**Change procedure**: policy changes that expand authority MUST be gated by a
production-readiness review. Policy changes that restrict authority (tightening
thresholds, adding constraints) may be applied immediately but must be recorded
in the tool-authority-health record.

### 1.5 Evaluator versioning

| Field | Description |
|---|---|
| `evaluator_id` | Unique evaluator identifier |
| `evaluator_version` | Semantic version of the evaluator |
| `evaluator_suite` | The set of eval cases this evaluator runs |
| `evaluator_gate` | Whether this evaluator is a release gate (`blocking` or `advisory`) |

**Change procedure**: evaluator changes that add or modify eval cases must be
reviewed for case quality. A blocking evaluator must pass before any
corresponding agent version can be promoted to production. Evaluator regression
(an evaluator that incorrectly passes or fails) is treated as a production
incident and routed through incident-learning.

## 2. Staged rollout

Rollout proceeds through four stages. Authority expands at each stage only when
the stage's exit criteria are satisfied and accountable humans independently grant the scoped authority through AI governance. Passing a rollout stage never grants permissions. Numeric values below are illustrative planning defaults requiring local evidence and governance approval, not universal safety thresholds. Appropriate escalation is a safe outcome, not inherently a regression.

### Classify escalation before using rollout metrics

Record trigger, underlying failure (if any), required protective response,
acknowledgement, disposition owner, and pending-work deadline separately.
A justified protective escalation is correct boundary handling; do not count it
as an avoidable failure merely because a human was involved. A tool outage or
unauthorized-action attempt remains a failure even when escalation handles it
correctly. Missed escalation, needless escalation against the contract, and
silent proceeding across a boundary are failures, not low-escalation successes.
Use all eligible requests as the denominator for the operational-failure rate;
count affected requests once and report protective escalation and unresolved
handoff counts separately. Define classification and limits before the canary.

For example, 8 of 100 canary requests correctly escalated for required approval
with acknowledged owners and no underlying defect do not fail a zero-failure
gate. Eight tool failures correctly escalated remain 8% operational failures.
Zero escalations from silently proceeding on those same blocked requests fails
boundary handling. Protective escalation is preferable to silent proceeding.
A surge in justified escalations can still require a traffic hold for operator
capacity or missed acknowledgement SLAs; investigate workload and capacity
without reclassifying correct protection as an agent defect. Promotion requires
resolved or explicitly accepted residual risks and an owned path for pending work.

### Stage 1 — Shadow / dry-run (0% traffic, read-only)

| Parameter | Value |
|---|---|
| Traffic | 0% of production traffic; replay of logged production requests |
| Authority | Read-only; side effects logged but not executed |
| Duration | Minimum 24 hours or until 1,000 requests processed, whichever is longer |
| Monitoring | Model latency, prompt compliance, uncertainty distribution |
| Exit criteria | p95 latency within 2x baseline; no authority breach attempts; uncertainty distribution within expected range |

### Stage 2 — Canary (1–5% traffic, read-only with logged side effects)

| Parameter | Value |
|---|---|
| Traffic | 1% of production, ramping to 5% over the observation window |
| Authority | Read-only in production; side effects logged but not executed (dual-write comparison against existing system output) |
| Duration | Minimum 48 hours |
| Monitoring | All stage-1 metrics plus: cost-per-request, dual-write divergence rate, user-satisfaction-equivalent signal |
| Exit criteria | Cost-per-request within budget; dual-write divergence < 2%; no missed required escalations; avoidable operational-failure rate within the locally agreed limit |

### Stage 3 — Limited production (5–25% traffic, side-effect-gated)

| Parameter | Value |
|---|---|
| Traffic | 5% ramping to 25% in 5% increments each 24 hours |
| Authority | Side-effect-capable per the authority contract, with `side_effect_approval: gate` (human approval required per side-effect class until proven safe) |
| Duration | Minimum 72 hours; each increment gates on the previous increment's exit criteria |
| Monitoring | All stage-2 metrics plus: side-effect audit trail, authority breach counter, classified escalation outcomes, tool health |
| Exit criteria | Side-effect audit clean (no unexpected mutations); authority breach count = 0; avoidable operational-failure rate < 1%; required escalation/handoff evidence complete; all tools healthy (health-check pass rate > 99%) |

### Stage 4 — Full production (25–100% traffic)

| Parameter | Value |
|---|---|
| Traffic | 25% to 100% in 25% increments each 24 hours |
| Authority | Only the currently effective authority contract; changing `side_effect_approval` from `gate` to `auto` requires an independently attributable human governance decision and verified external enforcement. Seven clean days alone never authorizes expansion |
| Duration | Continuous monitoring |
| Monitoring | All stage-3 metrics plus: cost-budget tracking, trace-to-eval feedback sampling, production-readiness re-review trigger |
| Exit criteria | N/A — continuous operation; triggers for fallback or disablement remain active |

### Rollout abort triggers (any stage)

If any of the following occurs during rollout, abort the current stage and fall
back to the previous stage's authority level:

- Any authority breach (stage 2+).
- Tool health-check failure for a critical tool (stage 3+).
- Cost-per-request > 150% of baseline for > 1 hour (stage 2+).
- p95 latency > 3x baseline for > 30 minutes (stage 2+).
- Avoidable operational-failure rate > 5%, or missed required escalation / unowned handoff (stage 3+).
- Production-readiness review outcome changes to `defer` or `no-go`.

## 3. Fallback

Fallback is a predetermined safe behavior when the agent, model, or a tool
cannot operate at normal capability. Fallback is distinct from disablement:
fallback preserves reduced capability; disablement removes all capability.

### Fallback paths by trigger

| Trigger | Fallback action | Rollback to |
|---|---|---|
| Model endpoint 5xx > 30s | Switch to `model_fallback` from the production contract | Previous model version |
| Model regression detected (eval score drop > threshold) | Switch to `model_fallback`; trigger eval re-run | Previous model version |
| Prompt regression detected | Revert to previous `prompt_version` | Previous prompt version |
| Critical tool unhealthy > 2 min | Degrade authority: revoke that tool's actions; agent continues with remaining tools | Previous tool-set configuration |
| Cost budget 100% consumed | Stop funded dispatch; use cached/no-cost response or separately authorized bounded fallback; retain pending obligations with an owner | No new spend from exhausted budget |
| Observed cost settlement reaches 110% | Disable and investigate accounting/overshoot; this is not an extra allowance | Offline |
| Latency p95 > 5x baseline > 2 min | Degrade to read-only; switch to `model_fallback` if model is the latency source | Read-only mode |
| Authority breach detected | Immediate: block the action; escalate; if breach count ≥ 3 in 24h, disable | Disabled |
| Privacy breach (PII access outside scope) | Immediate: revoke all data access; escalate; mandatory security review | Read-only, no data access |

### Fallback verification

Every fallback path must be exercised in a non-production environment before
the agent enters Stage 2 (canary) of rollout. The fallback exercise record
includes:

- Trigger simulated.
- Fallback action executed.
- Time to fallback completion measured.
- Post-fallback agent behavior verified (reduced authority, correct degraded
  response).
- Recovery path tested (return to normal operation after trigger clears).

Fallback exercises are repeated at each production-readiness review cycle.

## 4. Enforce descendant limits in the runtime

For delegated runs, use the attenuation and shared-budget contract in
[harness coordination](https://github.com/magnus919/agent-skills/blob/cb581ffec17d3bb0aee2cf605716d107c6e378ad/harness-engineering/references/loops-and-coordination.md).
Name the coordinator and execution-boundary policy service that enforce it:
intersect each child's grant with the current parent grant, issue scoped
credentials, and recheck cancellation, expiry, and revocation before dispatch
and commit. Fence stale workers and reconcile effects already in flight.

Use one durable task-budget ledger for parent and all descendants. Atomically
reserve bounded cost before concurrent dispatch; settle actual spend and release
only unused reservations after reconciliation. Retries and redelegation retain
the same ledger identity. Stop new work when available budget is exhausted;
read-only fallback and model calls also consume resources and need a funded
reservation. Fail closed or use a separately authorized bounded fallback if the
authority service or ledger is unavailable. Record enforcement evidence from
read-only-parent/write-child, parallel-budget, and cancellation exercises before
canary. These instructions and declared limits do not enforce permissions or
spend themselves; verify the actual executor and accounting implementation.