Kanban-decision-criteria
Part of Workflow architect. Install the skill and your agent reads this page when it needs the depth.
Kanban Decision Criteria
When to include a kanban board definition in the generated bundle — and when not to.
The Principle
Kanban adds value when work flows through a predictable, repeatable sequence of states where limiting work-in-progress and visualizing flow produces actionable insight.
Kanban subtracts value when work is emergent, exploratory, or reactive — situations where the states are unpredictable and WIP limits don't apply because there's nothing to limit.
Kanban-Appropriate Signals
Include a kanban board when the interview reveals:
1. Linear Phase Structure
The user describes their workflow as a sequence:
"I always start with triage, then pick something to build, then review it, then ship it."
Translation: A → B → C → D structure. Each phase has a clear entry and exit. Phases don't overlap or loop.
2. Explicit Hand-Offs
The user mentions waiting on others or passing work between people:
"After I finish my part, it goes to review. Sometimes it sits there for a day."
Translation: There are queues. Work accumulates between phases. Visualizing the queue helps manage flow.
3. Multiple Concurrent Items
The user tracks more than one active thing:
"I usually have 3-4 things in progress at various stages."
Translation: WIP limits are meaningful. Without a board, the user may not realize they're overcommitted.
4. Status as a Common Question
The user asks "where is X" or "what's the status of Y":
"People keep asking me where their PRs are in the review queue."
Translation: The workflow lacks visibility. A board provides it.
5. Fixed Completion Criteria
Each phase has a clear "done" condition:
"It's in review until someone approves it, then it's done."
Translation: Lane transitions are unambiguous. Nobody argues about whether something is "in review" or "in progress."
Kanban-Inappropriate Signals
Do NOT include a kanban board when the interview reveals:
1. Emergent Session Shape
Each session looks different depending on context:
"It really depends on what happened overnight. Sometimes I'm debugging, sometimes I'm building, sometimes I'm just researching."
Translation: The workflow is too context-dependent for lanes to be stable.
2. Single-Item Focus
The user works on one thing at a time to completion:
"I pick one thing and don't stop until it's done."
Translation: There's nothing to limit or prioritize on a board. A simple task list is more appropriate.
3. Exploratory / Creative Work
The process is discovery-driven:
"I start researching something and see where it leads. I don't know what I'll find until I find it."
Translation: The phases are emergent. Forcing a kanban structure would add friction, not clarity.
4. Reactive / Event-Driven
Work is driven by external events, not planned:
"I respond to alerts, requests, and fires. I don't really plan my sessions."
Translation: Kanban boards assume some level of planned workflow. Reactive work needs a ticketing system, not a board.
5. No Clear "Done"
The user can't describe what completion looks like for each phase:
"I know I'm done when it feels right."
Translation: If transitions are subjective, lanes become ambiguous. The board will need constant reinterpretation.
Decision Flowchart
Interview reveals workflow structure:
Is there a clear A → B → C → D sequence?
├── YES → Can the user name each phase's entry and exit?
│ ├── YES → Does the user have multiple concurrent items?
│ │ ├── YES → KANBAN. High-value fit.
│ │ └── NO → Is there a queue or hand-off between phases?
│ │ ├── YES → KANBAN. Still valuable for flow visibility.
│ │ └── NO → Kanban adds marginal value. Check user interest.
│ └── NO → Is the ambiguity in exit criteria only?
│ ├── YES → Kanban with softer lane boundaries. Defer to user.
│ └── NO → Kanban inappropriate. Use phase skills only.
└── NO → Is the workflow reactive or event-driven?
├── YES → Kanban inappropriate. Use phase skills only.
└── NO → Is the user interested in a board anyway?
├── YES → Generate lightweight kanban. Flag the limitation.
└── NO → Kanban inappropriate. Phase skills only.
Implementation
When kanban is appropriate, the bundle includes a kanban/ directory with
three files.
Board setup (kanban/board-setup.sh)
An executable shell script that creates the board:
#!/usr/bin/env bash
set -euo pipefail
hermes kanban boards create my-workflow \
--name "My Workflow" \
--description "Generated by workflow-architect" \
--switch
The user reviews and runs this. It does not create tasks — just the board container.
Task blueprints (kanban/task-blueprints.yaml)
Maps each workflow phase to a kanban task template. Phases are ordered sequentially; each phase's task depends on the previous one:
board_slug: my-workflow
archetype: build-review-deploy
blueprints:
- phase: build
title_template: "Build: {{feature}}"
skill: my-workflow/build
default_priority: 3
initial_status: todo
body: |
# Build Phase
Load skill: skill_view(name='my-workflow/build')
Definition of done: code written, tests passing, local build succeeds.
On completion: create a "Review" task with --parent pointing to this task.
- phase: review
title_template: "Review: {{feature}}"
skill: my-workflow/review
default_priority: 2
initial_status: ready
body: |
# Review Phase
Load skill: skill_view(name='my-workflow/review')
Definition of done: review complete, changes approved or requested.
On approval: create a "Deploy" task with --parent pointing to this task.
- phase: deploy
title_template: "Deploy: {{feature}}"
skill: my-workflow/deploy
default_priority: 1
initial_status: ready
body: |
# Deploy Phase
Load skill: skill_view(name='my-workflow/deploy')
Definition of done: change is live and verified. Terminal phase.
The dependency chain works through Hermes Kanban's built-in parent/child
task relationship. When Build (no parent) is done, Review (parent=Build)
auto-promotes from todo to ready. The dispatcher picks it up on the
next tick.
Lifecycle rules
| Phase | Initial status | Dependency | Auto-promotes when |
|---|---|---|---|
| First | todo |
None | User creates task manually |
| Middle | todo |
Previous phase task | Previous phase is done |
| Last | todo |
Previous phase task | Previous phase is done |
- Concurrent items: Users can create multiple first-phase tasks for parallel work items. Each spawns its own dependency chain.
- Blocked tasks: Any task can be manually moved to
blockedstatus. The dispatcher respects this and won't spawn blocked tasks. - Priority: First phase gets highest priority (3), last phase gets lowest (1). Tasks within a phase inherit the blueprint's default priority.