Wait-patterns
Part of Sf flow. Install the skill and your agent reads this page when it needs the depth.
Salesforce Flow Wait Element Patterns
Comprehensive guide to using Wait elements in Salesforce Flows for time-based and condition-based pausing.
Flow Type Compatibility
Wait elements have strict flow type requirements:
| Flow Type | Wait Supported? | Notes |
|---|---|---|
| Autolaunched Flow | ✅ Yes | Primary use case |
| Scheduled Flow | ✅ Yes | Often combined with scheduling |
| Orchestration | ✅ Yes | For complex multi-step processes |
| Screen Flow | ❌ No | Cannot pause user sessions |
| Record-Triggered Flow | ❌ No | Must complete synchronously |
| Platform Event Flow | ❌ No | Event-driven, no waiting |
Key Insight: If you need wait behavior in a Record-Triggered Flow, call an Autolaunched subflow that contains the Wait element.
Three Wait Element Types
1. Wait for Amount of Time (Duration-Based)
Pauses flow execution for a fixed duration.
Use Cases:
- Send follow-up email 24 hours after form submission
- Escalate case if not resolved within 48 hours
- Wait 7 days before survey request
XML Structure:
<waits>
<name>Wait_7_Days</name>
<label>Wait 7 Days</label>
<waitEvents>
<name>Duration_Complete</name>
<eventType>AlarmEvent</eventType>
<inputParameters>
<name>AlarmTime</name>
<value>
<elementReference>$Flow.CurrentDateTime</elementReference>
</value>
</inputParameters>
<inputParameters>
<name>TimeOffset</name>
<value>
<numberValue>7.0</numberValue>
</value>
</inputParameters>
<inputParameters>
<name>TimeOffsetUnit</name>
<value>
<stringValue>Days</stringValue>
</value>
</inputParameters>
<connector>
<targetReference>Next_Element</targetReference>
</connector>
</waitEvents>
</waits>
TimeOffsetUnit Options:
MinutesHoursDaysMonths
2. Wait Until Date (Date-Based)
Pauses until a specific date/time is reached.
Use Cases:
- Resume on contract expiration date
- Notify before subscription renewal
- Trigger on scheduled meeting time
XML Structure:
<waits>
<name>Wait_Until_Renewal</name>
<label>Wait Until Renewal Date</label>
<waitEvents>
<name>Date_Reached</name>
<eventType>DateRefAlarmEvent</eventType>
<inputParameters>
<name>DateTime</name>
<value>
<elementReference>var_RenewalDate</elementReference>
</value>
</inputParameters>
<connector>
<targetReference>Send_Renewal_Reminder</targetReference>
</connector>
</waitEvents>
</waits>
Pro Tip: Use a formula to calculate the target date:
<formulas>
<name>formula_RenewalReminder</name>
<dataType>DateTime</dataType>
<!-- 30 days before renewal -->
<expression>{!rec_Contract.EndDate} - 30</expression>
</formulas>
3. Wait for Conditions (Condition-Based)
Pauses until a field meets specified criteria OR timeout expires.
Use Cases:
- Resume when Case Status changes to 'Closed'
- Resume when Approval Status is 'Approved'
- Resume when Payment is 'Received'
XML Structure:
<waits>
<name>Wait_For_Approval</name>
<label>Wait for Approval</label>
<defaultConnector>
<targetReference>Handle_Timeout</targetReference>
</defaultConnector>
<defaultConnectorLabel>Max Wait Exceeded</defaultConnectorLabel>
<waitEvents>
<name>Approval_Received</name>
<conditionLogic>and</conditionLogic>
<conditions>
<leftValueReference>rec_Request.Status__c</leftValueReference>
<operator>EqualTo</operator>
<rightValue>
<stringValue>Approved</stringValue>
</rightValue>
</conditions>
<eventType>AlarmEvent</eventType>
<inputParameters>
<name>AlarmTime</name>
<value>
<elementReference>$Flow.CurrentDateTime</elementReference>
</value>
</inputParameters>
<inputParameters>
<name>TimeOffset</name>
<value>
<numberValue>30.0</numberValue>
</value>
</inputParameters>
<inputParameters>
<name>TimeOffsetUnit</name>
<value>
<stringValue>Days</stringValue>
</value>
</inputParameters>
<connector>
<targetReference>Process_Approved_Request</targetReference>
</connector>
<label>Approved</label>
</waitEvents>
</waits>
Warning: Condition-based waits are complex. Consider Platform Events for simpler event-driven patterns.
Best Practices
1. Always Handle Timeout Paths
<waits>
<name>Wait_With_Timeout</name>
<defaultConnector>
<targetReference>Handle_Timeout</targetReference>
</defaultConnector>
<defaultConnectorLabel>Timeout - No Response</defaultConnectorLabel>
<!-- waitEvents... -->
</waits>
2. Consider Governor Limits
Waiting flows consume org resources:
- Each paused flow interview counts against limits
- Long waits with many instances can accumulate
- Monitor with Setup → Flows → Paused and Waiting Interviews
3. Use Variables for Dynamic Durations
<variables>
<name>var_WaitDays</name>
<dataType>Number</dataType>
<value>
<numberValue>7.0</numberValue>
</value>
</variables>
<!-- Reference in Wait -->
<inputParameters>
<name>TimeOffset</name>
<value>
<elementReference>var_WaitDays</elementReference>
</value>
</inputParameters>
4. Test with Shorter Durations
In sandbox environments:
- Use minutes instead of days for testing
- Verify timeout paths work correctly
- Check debug logs for wait behavior
5. Document Wait Logic
Add XML comments explaining:
- Why this duration was chosen
- What happens on timeout
- Business context for the wait
<!--
Wait 7 days for customer response.
Business Rule: BR-2024-015 - Follow-up SLA
Timeout Action: Escalate to manager
-->
<waits>
<name>Wait_Customer_Response</name>
<!-- ... -->
</waits>
Common Patterns
Follow-Up Email Pattern
Start
↓
Create Case → Wait 24 Hours → Check Status → (If Open) → Send Follow-Up
↓
(If Closed) → End
Escalation Ladder Pattern
Start
↓
Create Task → Wait 2 Days → Not Complete? → Escalate to Lead
↓
Wait 2 Days → Not Complete? → Escalate to Manager
↓
Wait 1 Day → Auto-Close with Note
Approval Wait Pattern
Start
↓
Submit for Approval → Wait for Approval (30 day max)
↓ ↓
(Approved) (Timeout)
↓ ↓
Process Request Notify Submitter
Platform Events vs. Wait for Conditions
Consider Platform Events when:
| Scenario | Use Wait | Use Platform Event |
|---|---|---|
| Fixed time delay | ✅ | ❌ |
| Wait for date | ✅ | ❌ |
| External system callback | ❌ | ✅ |
| Real-time field change | ❌ | ✅ |
| Complex event correlation | ❌ | ✅ |
| Simple status check | ✅ | ❌ |
Platform Event Advantage: Immediate response when event fires, no polling delay.
Wait Advantage: Simpler setup, no Platform Event definition required.
Troubleshooting
Paused Interview Not Resuming
- Check interview status in Setup → Flows → Paused and Waiting Interviews
- Verify target date hasn't passed (for Date-based waits)
- Check condition field values match expected criteria
- Review debug logs for errors during resume
Too Many Paused Interviews
- Add timeout paths to prevent indefinite waits
- Consider batch cleanup flow for stale interviews
- Reduce wait durations where possible
- Use
Database.deleteAsync()in Apex for cleanup
Performance Issues
- Avoid Wait elements in high-volume flows
- Consider Platform Events for real-time needs
- Use Scheduled Flows instead of Wait for batch operations
Related Templates
sf-flow/assets/wait-template.xml- All three wait patterns with examplessf-flow/assets/platform-event-flow-template.xml- Event-driven alternativesf-flow/assets/scheduled-flow-template.xml- Scheduled batch processing