Reference · Sf flow
Testing-checklist
Part of Sf flow. Install the skill and your agent reads this page when it needs the depth.
Flow Testing Checklist
Version: 2.0.0 Purpose: Quick-reference checklist for flow testing Usage: Copy and use for each flow deployment
Pre-Testing Setup
- Flow XML validates without errors
- All decision paths documented
- Test data prepared in sandbox
- Debug logs enabled for test user
Path Coverage
- All decision branches tested (including default)
- All loop scenarios tested:
- 0 items (empty collection)
- 1 item
- Many items (10+)
- All fault paths tested
- Positive cases pass (valid inputs)
- Negative cases handled gracefully (invalid inputs)
Bulk Testing
- Single record works correctly
- 10-20 records work (basic bulkification)
- 200+ records work (no governor limit errors)
- No DML-in-loop errors in debug logs
Edge Cases
- Null values handled (no crashes)
- Empty collections handled (loops skip gracefully)
- Max field lengths work (no truncation)
- Special characters work (
<>&"') - Date edge cases work (leap years, boundaries)
User Context
- Works as System Administrator
- Works as Standard User
- FLS restrictions enforced (User mode flows)
- Sharing rules respected
- Custom permissions work (
$Permission)
Error Handling
- All DML elements have fault paths
- Error messages are user-friendly
- Rollback logic works (if multi-step DML)
- Error logging captures context
Screen Flow Specific
- All navigation works (Next/Previous/Finish)
- Input validation works on each screen
- Conditional visibility works
- Progress indicator updates (if applicable)
- Back button behavior correct
Record-Triggered Specific
- Entry conditions filter correctly
- Before-save vs After-save timing correct
-
$Recordvalues accessible - Re-entry prevention works (if applicable)
Scheduled Flow Specific
- Schedule configuration verified
- Manual run test passes
- Empty result set handled
- Batch processing works
Deployment
-
checkOnly=truedeployment succeeds - package.xml API version matches flow
- Test in sandbox complete
- Activation plan documented
Post-Deployment
- Flow status verified (Active/Draft)
- Correct version is active
- No errors in Flow Errors log
- First execution monitored
Sign-Off
| Item | Completed | Date | Tester |
|---|---|---|---|
| Development Testing | |||
| UAT Testing | |||
| Bulk Testing | |||
| Security Review | |||
| Production Deployment |
Notes
Add any flow-specific notes or exceptions here